This is a printable form. Refinery Questionnaire / API Form
Name: _______________________________ Phone: __________________________________ (Buyer and person filling out form) Company name: ___________________________ Fax: ___________________________________
Address: _________________________________ E-mail address: ___________________________
Web Site: ________________________________
Information outlined below is needed to insure the refinery(s) for sale or to be built can make all the products the buyer is in need of, and what other components would be required.Need API of crude supply for production capability, and percentage of product output that can be made.
1. Specific Gravity or API: ______________________ if specific Gravity or API is not known, 40.8 API will be assumed.
2. Weight percent of sulphur in the Crude: __________ If Sulphur content is not known, a Sulphur content of less than 0.5 by weight will be assumed and special alloy will not be used.
3. Amount of Salt in the Crude: __________________ If the Salt content is not known, a salt content of less than 14.4 mg/litre will be assumed and a desalter will not be included.
4. T8P or ASTM distillation for the Crude: _________ If distillation data is not known, but the Crude Specific Gravity is known, we will assume an average distillation __________________________________________ for the specific gravity given. If the specific gravity is Not given, we will use data for West Texas Intermediate Crude.
5. Temperature of the Crude feed: ________________ If the temperature of the crude feed is not known, an Average temperature of 70F (21C) will be assumed.
6. Net Positive Static Head (NPSH): ______________ The Crude Feed tanks should be located within 500 feet of the processing plant and at least 5 feet of Net Positive Static Head available. If this is not so, the crude feed pumps will Have to be mounted on a special skid at an extra cost, and located at the product tanks.
7. Capacity of the plant in metric tons per year and barrels per day: _______________ Present Plan ________ BPD Future Plan _________BPD
Metric Tons per day________ Per Year________
Purchase of a Refinery. Detailed Information
Location: In what Geographical locations will the refinery be located? _______________________________________
Has all permitting and site design been completed? Y____ N _____ Permits active or need to be reactivated. Y___ N_____ Discuss. _____________________________________
Is Site location completed? Y____ N _____ What amount of land was or will be purchased? ___________ If not, what stage of planning has been completed? _____________________
Is natural gas available and if so what pressure. ______ Weather conditions at site.______________________
Specific Gravity or API provided._____________ Temperature of the crude feed.______________
Expansion of Refinery. Is there a refinery currently in operation at site? Y____ N____ Capacity of the plant.____________________ Total Products Produced. __________________ List of Products produced. _____________________ Products desired. Future Goal. _______________________________________
Power Supply: Is there a power or Electrical source currently in place? _____If so what hz and voltage ________ 3 phase? ________ If answer is YES, provide details of Power Plant required If NO / then a power plant is needed. Should Global include Power plant in purchase of refinery. Y____ N. _____ Water Supply: Y_____ N____
Products Desired
1. Motor Gasoline – Octane? __________Unleaded? _________ Can lead or other additives be used? _________ 2. Aviation Jet fuel? ______________________ Kerosene? __________________ Both? ___________________ 3. Diesel – Artic Diesel? __________________ Winter Diesel? ______________ Summer Diesel? ___________ 4. Fuel Oil? __________ Asphalt? _________ Other? ______________
Products. Jet fuel-Diesel - other. A refinery can only produce a % ratio of products of the plant capacity! Jet Fuel is 15%-20% and Diesel is possibly 25-30% of total refinery capacity! It is important to know that the quality of the crude (API) will define the final output of each product.
Ownership: Private ___________ JV____________ Government ____________ Other _____________
Crude Supply provided / Inside _______ Outside country ______ Pipeline _______ Ship _________
Refinery Preference: New____ Used ____ Surplus ____ Goal to complete Project in years __________
Construction: Has a (Turnkey) Contractor been selected for final installation? Y_____ N ____ If not, does the buyer need a Turnkey contractor? Y_____ N ____
Capital: Is full funding for Project in place, Y___ N___, or needs to be completed? Y____ N ____ If not, what time frame to complete final funding? Date: ___________ Does the buyer need financing or other options? ____________ JV Option. Y___ N____ If financing were required, would the Buyer consider a partnership? Y ___ N ____
COMMENTS: ____________________________________________________________________________________\
_________________________________________________________________________________________________
Information on the Site
Has the location and permits been approved or obtained? Y ____ N ___ Crude supply available? Y___ N ___
1. Is Steam available? _________ if so, what pressure? ___________________ lb/hour
2. Is Natural Gas available? ______________ If so, what pressure? ____________,
3. Global will assume 900 BTU/CF if not known.
4. Is an electrical supply available? Y___N ___ If so, specify voltage; __________ phase 50 Hz ____ 60Hz? _____ Details. __________________ if not, a power source is required. Y______N______ 5. Is a water supply available? Y._____ N _____ If no, plans are needed for such.____________________ 6. Weather conditions at the site? ___________________ Maximum ____and Minimum____ temperature 7. Civil Engineering completed? Y ____ N _____ (A Turnkey Contractor provides such if not) 8. Total Acres? __________ How far from the ocean? _____ City? _____ Population __________
Operations and Maintenance
Is there a need for a Contractor to Turnkey the project, including: shipment from the USA, delivery to site, build site and tank farms (storage), assemble, provide support group, and start up the plant(s). Need experienced management personnel to operate and train the employees? Y _____ N _____ Comments: _________________________________________________________
Need an Operations and Maintenance contract to continue to operate plant. Time Period needed? 1 - 2 – 3- 4 - 5 - +____ years? Circle answer please. Employment: Will the buyer require, accept outside key management personnel to train and teach local people to operate the plant? Y _____ No _____. Can the owners be responsible for safety issues? Y___ N ___
ADDITIONAL QUESTIONS FROM BUYER Y _____ No ______ If yes then please fill in the space below with all questions or requests.
ADDITIONAL QUESTIONS MAY BE SENT AS NEEDED.
Questions and Notes: |